Location
Karawang, West Java
Duration
Mar 2023 - Sep 2023
Project Value
Rp 8M - 15M
Status
Completed
Project Overview
Comprehensive automation project for automotive parts manufacturing, including PLC programming, sensor integration, and robotic arm installation.
Our Approach
How we delivered exceptional results
The Challenge
Manual assembly line was creating bottlenecks and quality inconsistencies, limiting production capacity.
Our Solution
Designed and installed a fully automated system with real-time monitoring, reducing human error and increasing throughput.
Final Result
Production efficiency increased by 40%, defect rate reduced by 65%, and annual savings of Rp 2M achieved.
Key Achievements
Measurable outcomes that demonstrate our impact